South African Diamond Mine
*
The alluvial mine is located in Barkly West (32 km west of Kimberley) in South Africa
*
The mine was set to go into full production in 2004, when the permit was obtained, but lacked the capital resources
*
Prospecting was done and diamonds recovered
*
The presence of alluvial as well as Kimberlite structures has been confirmed
*
A recovery barge is half way built, capable of extracting 100-150 tons of gravel per day.
*
Approximately 37 carats will be recovered for every 100 tons of gravel processed.
*
There are several mining areas and one area has a resource estimate of minimum 12,000 carats.
*
A 2004 geologist report is available.
*
The entire mining area covers 6.7 kilometers of riverbed.
*
Additional capital of about $250,000 USD will be needed for equipment purchases.
*
The Seller will work and run the mine for the buyer for at least 6 months after the acquisition.
*
REDUCED to $5,000,000 USD or best offer.
Pete Thompson
AJ Thompson Business Services
705B Lakeview Plaza Boulevard
Worthington, Ohio 43085 U.S.A.
+1 (877)871-5367 phone/fax
pete@ajtbs.com
www.ajtbs.com
skype: ajtbsllc
http://www.facebook.com/#!/pages/Worthington-OH/AJ-Thompson-Business-Services/146403565372128
No comments:
Post a Comment